STEP 1: RECEIVING DATA FOR QUOTATION
Receive information and data from customers, conduct surveys, and take measurements at the factory
STEP 2: 3D LAYOUT DESIGN AND QUOTATION
Design 3D models of main equipment and prepare a quotation for the customer.
STEP 3: PREPARE 2D DRAWINGS FOR ASSEMBLY AND MANUFACTURING
Prepare detailed 2D assembly and manufacturing drawings, including dimensions, materials, tolerances, and a bill of materials (BOM), then send them to the customer for review and approval before production.
STEP 4: INSTALLATION AND MACHINE COMMISSIONING
Install and operate the machine at the customer’s factory, ensuring proper functionality and performance.
The automatic feeding system for the stamping machine at the customer’s factory, ensuring smooth material feeding, proper synchronization with the stamping process, and optimal performance. Conduct test runs to fine-tune operations and ensure the system works efficiently.
Design and install a rotary table system that integrates multiple stages of the production process, such as feeding, stamping, assembling, and inspecting. The system ensures seamless transitions between operations, increases automation efficiency, reduces manual handling, and enhances overall productivity. Thorough testing and fine-tuning are conducted to guarantee smooth and precise functionality.
Design a 3D layout for the bakery conveyor system, covering the entire production line .The packaging stage includes automatic or semi-automatic machines for sorting, wrapping, sealing, and labeling the baked goods. Ensure the design optimizes space, streamlines workflow, and integrates automation for consistent product quality and high efficiency.
Provide ongoing support and maintenance for automated systems, including regular inspections, troubleshooting, software updates, and ensuring optimal machine performance to minimize downtime and enhance production efficiency.
WHAT OUR CUSTOMERS SAY ABOUT US
⭐️⭐️⭐️⭐️⭐️
⭐️⭐️⭐️⭐️⭐️
⭐️⭐️⭐️⭐️⭐️
CUSTOMERS AND SUPPLIERS